Proposed City Hotel at No.169, Dr. Colvin R. De Silva Mawatha, Colombo 02 for Sanken
Piling Work for Proposed City Hotel at No.169, Dr. Colvin R. De Silva Mawatha, Colombo 02 for Sanken Construction (Pvt) Ltd
No. of Piles: 49 Nos Piles
Piling Work for Proposed City Hotel at No.169, Dr. Colvin R. De Silva Mawatha, Colombo 02 for Sanken Construction (Pvt) Ltd
No. of Piles: 49 Nos Piles