Proposed New Bridge Construction Project over the Kelani River (Package – I)

Piling Works of Proposed JICA Funded New Six Lane Bridge Over the Kelani River (Package – I) for Sierra Construction Limited
No. of Piles: 50 Nos
Piling Works of Proposed JICA Funded New Six Lane Bridge Over the Kelani River (Package – I) for Sierra Construction Limited
No. of Piles: 50 Nos