Proposed Transmission Units Piling Works for New Bridge over Kelani River Phase I & II

Piling Works for Shifting of Kelanitissa – Biyagama 220KV and Kolonnawa – Kelanitissa 132KV Transmission Lines to Facilitate Construction of the New Bridge over the Kelani River for Ceylex Engineering (Pvt) Ltd, Phase I & II
No. of Piles : 14 Nos & 04 Nos